Tampilkan postingan dengan label lampung. Tampilkan semua postingan
Tampilkan postingan dengan label lampung. Tampilkan semua postingan

Rabu, 25 Februari 2009

DKP protect Petroleum Island in East Lampung

BANDAR LAMPUNG :

a small island which has been expected store a lot of oil/petroleum in EastLampung, slowly disappear from Lampung Province area because upgrading of sea water level surface.

To anticipate this situation, Sea and Fish Culture Departement of Lampung Province has been budgeting fund about 100 milion rupiahs for surveying project to secure and protecting this island and other island near lampung region boundary.

"This Island called the hidden island because it's unseen because sea water level change. Lampung Province Goverment had puted a marker to sign/mark the position of this island. If This Petroleum Island had not been being protected and marked the island would be slowly vanish.

This Island hide alot of petroleaum oil resources.This Oil is one of Big aset of East Lampung Goverment and Lampung Province Goverment. The Island claimed as Lampung Province right and property. Indonesian Goverment warned the Lampung Province Goverment to keep wathcing, keeping, and protecting this island, and save the island from vanishing to under sea water level.

Soon DKP(Bureau of Little Island Keeper) put an agreement and associate withTNI AL (Indonesian Navy), they agree to come to this island and watch for marking this island and keep this island away from vanish. To Marking the Island soon there will be a new building build and the Island structure soon renovated. Ofcourse it will be needing alot of Civil Enginer and Geology Technic Enginer to renovated this Island.

There are 69 Island in outer side of Lampung Province. Some of them probably has the same potential resources such as this Island. But they are still unmarked.


Selasa, 24 Februari 2009


Pertamina Geothermal Produced 10 MWe Geothermal in Lampung Site

Bandar Lampung - PT Pertamina Geothermal Energy (PGE) has been produced geothermal electric power on 10 MWe from well production test UBL 3, villages Ulubelu, Tanggamus District, Lampung Province Wednesday November 19th 2008.

This production is one of their first step plan to developing geothermal industry in this area, where this site aproximately has potensial reach about 300 MWe.This Well (UBL 3) is one of 15 wells at Ulubelu Region to produce electric suply untill 2×55 MWe.

For the first step PT PGE will suply geothermal power to PT PLN Power Plan at PLTP unit 1 & 2. The next step project will be totaly controled by PT PGE.

UBL 3 Well has dip direction well about 2320 mku (meter size dip), temperature reservoir 260 °C with resevoar type dominated by water. Drilling for this well begun on March 31th 08 and finish on May 31th 2008, by using local expert.

PT PGE is amember company under PT Pertamina (persero) with their bussines in Management of Geothermal Energy.PT PGE produced electric about 252 MWe from Kamojang geothermalfield, Lahendong, Sibayak. Today PT PGE has been exploring in many region such as Lumut Balai (South Sumatra), HuluLais (Bengkulu), Sungai Penuh (Jambi). Expecting target in 5 year ahead PT PGE will produce 800 MWe.